Hello:
  I am running aMD jobs, and I found very strange output informations:
  NSTEP =   369000   TIME(PS) =   21338.000  TEMP(K) =   310.55 PRESS 
=     6.4
  Etot   =    -80335.3506  EKtot   =     23683.2341  EPtot      = 
-104018.5847
  BOND   =      1027.4436  ANGLE   =      2655.5605  DIHED =      6349.5495
  1-4 NB =      1121.1413  1-4 EEL =     12183.0176  VDWAALS    = 10684.7634
  EELEC  =   -138040.0606  EHBOND  =         0.0000  RESTRAINT =         
0.0000
  EKCMT  =     10110.3911  VIRIAL  =     10057.5881  VOLUME     = 
382341.5831
                                                     Density =         
0.9951
  Ewald error estimate:   0.1624E-04
  ------------------------------------------------------------------------------
| Current Timing Info
| -------------------
| Total steps :  20000000 | Completed :    369000 | Remaining : 19631000
|
| Average timings for last    4000 steps:
|     Elapsed(s) =      74.12 Per Step(ms) =      18.53
|         ns/day =       9.32   seconds/ns =    9265.45
|
| Average timings for all steps:
|     Elapsed(s) =    6856.50 Per Step(ms) =      18.58
|         ns/day =       9.30   seconds/ns =    9290.65
|
The job only running for two few hours, but the  TIME(PS) = 21338.000.
How could this happen?
thank you very much
best
Albert
_______________________________________________
AMBER mailing list
AMBER.ambermd.org
http://lists.ambermd.org/mailman/listinfo/amber
Received on Thu Mar 28 2013 - 03:30:02 PDT