Re: AMBER: gibbs pmf calculation

From: David A. Case <case.scripps.edu>
Date: Mon, 25 Aug 2003 16:07:16 -0700

On Mon, Aug 25, 2003, Lishan Yao wrote:

> I fixed the problem by changing my input file. But then the new
> problem comes:
>
> Total accumulated time: 2.53 (seconds) / 0.00 (hours)
> %GIBBS-I-NEWRUN, Begining NRUN = 1
> ERROR from RESNBA: Number of non-bonded pairs exceeds the maximum
> allowable ( 2790891). Increase integer storage.

You must edit the top of gib.f to increase the "memmax" parameter, then
re-compile.

If you are not experienced with gibbs, I would recommend trying a calculation
on a smaller problem first, to make sure you understand how the program
(which is a difficult one) works.

...good luck...dac

-- 
==================================================================
David A. Case                     |  e-mail:      case.scripps.edu
Dept. of Molecular Biology, TPC15 |  fax:          +1-858-784-8896
The Scripps Research Institute    |  phone:        +1-858-784-9768
10550 N. Torrey Pines Rd.         |  home page:                   
La Jolla CA 92037  USA            |    http://www.scripps.edu/case
==================================================================
-----------------------------------------------------------------------
The AMBER Mail Reflector
To post, send mail to amber.scripps.edu
To unsubscribe, send "unsubscribe amber" to majordomo.scripps.edu
Received on Tue Aug 26 2003 - 00:53:01 PDT
Custom Search